Posted on Mar 28, 2018 in Projects

We recently undertook the installation of all services pipework within a food production facility in Leeming Bar. In addition to the hot, cold and steam lines, Fusion Heat and Power were tasked to install the heat recovery system designed by ARBE Integrated Engineering. The system recovered heat from the chiller compressors and stored it within a thermal store, from there it was used to preheat the hot water calorifiers to reduce running costs. Upon commissioning the system was successfully pre-heating the hot water to 45 degrees, leading to huge savings!

Upon completion of the services Fusion were then asked to install all washroom and cleaning equipment.

please contact us to find out more about heat recovery solutions for your business.